000 00715nam a2200169Ia 4500
001 MPKV055030
008 120911s9999 xx 000 0 und d
082 _a631.3/CHA
100 _aChavanke, V.A
245 _aSequential generation of fortnightly stream flow of Godavari river at Gangapur dam site using operational hydrology models
_cChavanke, V.A; Atre, A.A [Gd.]
246 _aSequential generation of fortnightly stream flow of Godavari river at Gangapur dam site using operational hydrology models
260 _aM.P.K.V Rahuri
_bM.P.K.V Rahuri
_c2009
300 _b60 pp
650 _aAgricultural Engineering soil and water conservation Engineering
700 _aAtre, A.A [Gd.]
700 _aChavanke, V.A
999 _c53026
_d53026